BIM SERVICES

//sgreng.com/wp-content/uploads/2019/08/Picture-23.png
section-829d1c2
https://sgreng.com/wp-content/uploads/2019/08/Picture29-400x400.jpg

PROCESS BIM

  • We provide engineering and construction services on the Mechanical & Electrical (M&E) systems that support many industrial processes.
  • Our services include turnkey Mechanical & Electrical construction for process plants, cylindrical and spherical storage tank design & construction, underground pipeline construction and other general M&E works.
  •  We serve industries across almost all industry sectors such as Semiconductor Fab, Oil & Gas, Petrochemical, Pharmaceutical Industry, Industrial Gases and others.
section-bbec6d0
https://sgreng.com/wp-content/uploads/2019/08/Picture30-500x500.jpg

MEP BIM

      • We generate models from concept stage to design development, shop drawings and as built models
      • We provide value engineering and coordination for MEP services (sizing, rerouting with to reference respective standards)
section-e3a0696
//sgreng.com/wp-content/uploads/2019/08/Picture31.jpg

BIM CONTENT DEVELOPMENT

      • To enforce company / manufacturer standards
      • Custom templates to address specific needs
      • Step by step parametric families
      • Revit family development with Geometry and data rich attributes
section-7d6ac1a
//sgreng.com/wp-content/uploads/2019/08/Picture24.png

BIM IMPLEMENTATION

      • Firm wide BIM policy & Implementation Guidelines
      • Project wise Implementation
      • BIM Manual for Firm
      • Setting up QA/QC Manual for Company
      • Content Development – Families, Templates
      • Software & Hardware Consulting with ROI
      • Model Auditing
section-85797dc

BIM – LEVEL OF DEVELOPMENT

 Defines how the 3D geometry of the building model can achieve different levels of refinement, is used as a measure of the service level required”

https://sgreng.com/wp-content/uploads/2019/08/Picture32-400x300.jpg

LOD 100 – Concept Design

The building 3D model is developed to represent the information on basic level. Thereby, only conceptual model creation is possible in this stage. Parameters like area, height, volume, location and orientation are defined.

LOD 200 - Schematic Design

General model where elements are modelled with approximate quantities, size, shape, location and orientation. We can also attach non- geometric information to the model elements.

LOD 300 - Detailed Design

Accurate modeling and shop drawings where elements are defined with specific assemblies, precise quantity, size, shape, location and orientation. Here too we can attach non- geometric information to the model elements.

LOD 350 – Construction Documentation

It includes model detail and element that represent how building elements interface with various systems and other building elements with graphics and written definitions.

LOD 400 - Fabrication & Assembly

Model elements are modelled as specific assemblies, with complete fabrication, assembly, and detailing information in addition to precise quantity, size, shape, location and orientation. Non- geometric information to the model elements can also be attached.

LOD 500 - As-Built

Elements are modelled as constructed assemblies for Maintenance and operations. In addition to actual and accurate in size, shape, location, quantity, and orientation, non-geometric information is attached to modelled elements. Laser scanning of site and rendering to BIM is also one of the services included in this package.

section-472b894

Building Information Modeling

Building Information Modeling (BIM) is the holistic process of creating and managing information for a built asset. Based on an intelligent model and enabled by a cloud platform, BIM integrates structured, multi-disciplinary data to produce a digital representation of an asset across its lifecycle, from planning stage to design stage of construction and operations.

section-0442aab
https://sgreng.com/wp-content/uploads/2019/08/Picture33-200x200.jpg

 

 

“A foundational, intelligent model-based process for business and industry transformation”

section-144e75b
//sgreng.com/wp-content/uploads/2019/08/Picture34.jpg

  3D

Uses 3D models to capture, explore, and maintain consistent and coordinated planning, design, construction, and operational data

section-b1f924b
//sgreng.com/wp-content/uploads/2019/08/Picture36.jpg

TIME

Enables prompt response to change with processes that are smarter and faster

section-8b8d99c
//sgreng.com/wp-content/uploads/2019/08/Picture35.jpg

COST

Provides greater project insight for cost, schedule, and constructability.

section-7e1ee92
//sgreng.com/wp-content/uploads/2019/08/Picture37.jpg

 DATA

Uses and shares the same consistent data whether you’re at your desk or in the field

BIM MODELLING / LOD 100 TO 300 / DEVELOPING SEQUENCE

"Developing BIM 3D models from Inputs such as Distribution Schematic, Utility P&ID, AutoCAD design Inputs, Data cutsheets & Manufacturer Catalog for the Asset "
section-638baa5
EQUIPMENT FACILITY / FAMILY CREATION

Manufacturer Cut Sheets / Catalog Details / 2D Inputs

https://sgreng.com/wp-content/uploads/2019/08/Picture38-300x200.jpg

Parametric & Non-Parametric Families
LAYOUT
section-18ac4b2
EQUIPMENT PLACEMENT

Populating the Created LOD 400 Families as per the Equipment Layout in respective Chemical Rooms

https://sgreng.com/wp-content/uploads/2019/08/Picture40-300x200.png

section-c48cc27
UNISTRUT SUPPORTS / MOUNTING RACKS

Creation & Placement of Unistrut Supports as per SPM Co-ordination Section Details

https://sgreng.com/wp-content/uploads/2019/08/Picture42-300x200.jpg

Creation & Placement of Mounting Racks for Various Equipment

LAYOUT
section-5a550a0
INTERCONNECTING PIPING / CHEMICAL

Modelling of Inter-Connection Piping (RMB to VMB) as per Standards with reference of respective PFD.

https://sgreng.com/wp-content/uploads/2019/08/Picture44-300x200.jpg

section-b035e22

DISTRIBUTION PIPING / CHEMICAL

Modelling of Distribution Chemical Piping (RMB to VMB) as per Standards with reference of respective PFD
https://sgreng.com/wp-content/uploads/2019/08/Picture48-300x200.jpg
From Level 1 Pipe Riser to Level 2 VMB

section-6390418
https://sgreng.com/wp-content/uploads/2019/08/dp-300x200.jpg
From Level 1 ( Chemical Room to Riser Level )

section-0bd0aef
UTILITY PIPING / UPW

Modelling of Utility Piping (UPW) as per standards with the respective PID as reference.

https://sgreng.com/wp-content/uploads/2019/08/Picture50-300x200.jpg

UPW Provision to Each Equipment in Chemical Room.
LAYOUT
section-ee998b6
UTILITY PIPING / BULK GAS

Modelling of Utility Bulk Gas Piping as per Standards by referring the respective PID.

https://sgreng.com/wp-content/uploads/2019/08/Picture52-300x200.jpg

Bulk Gas (CDA / GN2) to Each Equipment in Chemical Room.
LAYOUT
section-5b65391
UTILITY PIPING / DRAIN

Modelling of Utility Drain Piping as per Standards by referring the respective PID.

https://sgreng.com/wp-content/uploads/2019/08/Picture55-300x200.jpg

Drain from Each Equipment to Sump Pit & from Sump Pit to Discharge Header
LAYOUT
section-4054fcf
UTILITY PIPING / EXHAUST

Modelling of Exhaust as per standards with reference of respective PID.

https://sgreng.com/wp-content/uploads/2019/08/Picture57-300x200.jpg

Exhaust from Each Equipment (CTDM / SUMP / BCTU / CCB) & Tie into Mechanical Exhaust
LAYOUT
section-1ef24d7

ELECTRICAL & CONTROL

https://sgreng.com/wp-content/uploads/2019/08/Picture59-300x200.jpg

Power (NPS/UPS) & Control Trunking from Equipment to the respective MDB / RIO / EMO.

SGR ENGINEERING SERVICE PTE. LTD recruits well educated, flexible and ambitious people who thrive on change and challenge, are innovative, self-confident and accept responsibility by taking initiative and adapting to a stimulating international working environment.

  • Tel: +65 91934818

  • sgr@sgreng.com

  • 3 Soon Lee Street, #01-40 Pioneer Junction, Singapore – 627606

  • Mo-Fri: 8am - 6pm
    Sat: 10am - 4pm
    Sun: off

  • Website: www.sgreng.com